Tyndale Christian School | Stage 4
These buildings form stage 1 of the current masterplan. The buildings accommodate the Library and STEM science facilities. The library is located centrally in the school and frames the school’s environment with views of the existing trees and playing fields. This space is over two levels, these are visually linked by a generous tiered learning setting edged by a curved opening repeating other forms in the school. The STEM Science building links existing TAS Art facilities to reinforce a STEM environment.
-
Client: Tyndale Christian School
Completed: 2024
Area: 2,070 m2
Value: $9 million
Photography by Sara Vita