Tyndale Christian School | Stage 4

These buildings form stage 1 of the current masterplan. The buildings accommodate the Library and STEM science facilities. The library is located centrally in the school and frames the school’s environment with views of the existing trees and playing fields. This space is over two levels, these are visually linked by a generous tiered learning setting edged by a curved opening repeating other forms in the school. The STEM Science building links existing TAS Art facilities to reinforce a STEM environment.

    • Client: Tyndale Christian School

    • Completed: 2024

    • Area: 2,070 m2

    • Value: $9 million

Photography by Sara Vita